
“It’s the most wonderful time of the year…” Cindy and Michael talk about the worst time to try to start and complete a remodel. Thanksgiving to Christmas. It is the worst time to start or complete and remodel. Homeowners wake up from the summer slumber and realize it is time to get things moving. All…

This was a project I worked on in Noe Valley. This design was amazing. The place was like a showroom. Obscure glass barn doors
Going online can be a time sink. This cheat sheet will save you time. I have narrowed down publications and websites which I fund useful when researching what décor, architecture, landscaping, and interior design you like. Short List, aka Mike’s Hack: This is when I just need to stay on top of things quickly. I…
In this video, I talk about bringing the natural beauty of the outside to be reflected inside the home. The layout and the flow of the house, lighting design with both natural light (windows) and artificial (LED) critical in creating a warm mood for the home. Natural light and access to outdoor air will influence…

Whole House Remodel: My client wanted to remodel all their bathrooms, refinish the floors, add recessed lights and paint the interior of the house. This project took about 3 to 4 months to complete. The client moved out for the remodel.
Before: This was a 1930’s cottage in the Barron Park Neighborhood of Palo Alto. The home needed severe work. There was a broken foundation, dry rot and termites were holding hands to support the walls. The original house was 2 bedroom and 1 bath house totaling 900 sq ft of house with a detached garage.